Projects
Tri-West Investments, LLC
Central Valley Meat California Rendering Plant Addition
Tri-West Investments, LLC
Project: Central Valley Meat California Rendering Plant Addition
Location
Hanford, CASquare Footage
46,298Services
- A&E
Description
Precast and cast-in-place concrete form the structure for this rendering facility. A noteworthy aspect of this project is the nearly 1 million pounds of rooftop equipment and the 16ft deep CIP concrete equipment pit.
Mike Jackson Farms
Bravo Farms Retail Facility
Mike Jackson Farms
Project: Bravo Farms Retail Facility
Location
Kettleman City, CASquare Footage
38,202Services
- A&E
Description
An Old West style two-story wood and steel framed retail and food service facility just off of the I-5. The fun atmosphere and beautiful design is a required stop for anyone traveling through Kettleman City.
Poverello
Warehouse, Shade Canopy, and Showers
Poverello
Project: Warehouse, Shade Canopy, and Showers
Location
Fresno, CASquare Footage
19,100Services
- A&E
Description
GMA is proud to have provided architectural design for the warehouse and engineering for the metal building foundations as well as design of the CMU shower facility.
Steel Structures
Steel Tanks, Silos, Bins, Pressure Vessels
Steel Structures
Project: Steel Tanks, Silos, Bins, Pressure Vessels
Location
Multiple StatesSquare Footage
N.A.Services
- E
Description
GMA has engineered just about every type of steel tank imaginable. Coned bottom, flat bottomed, horizontal, tanks supported on the ground, on legs, and on skirts. You name it, we have engineered it.
Span Construction & Engineering, Inc
Project Falcon Glass Plant
Span Construction & Engineering, Inc
Project: Project Falcon Glass Plant
Location
Troy Township, OHSquare Footage
Approx. 400,000Services
- E
Description
GMA provided the foundation design for the multiple metal building structures making up this massive glass manufacturing facility. In addition GMA provided engineered for the concrete retaining walls for the series of basements required for the manufacturing process ranging up to 29ft deep as well as the steel framing for the elevated flooring system.
Merck – Durham, NC
Medical Research and Development Facility
Merck – Durham, NC
Project: Medical Research and Development Facility
Location
Durham, NCSquare Footage
Over 250,000Services
- A&E
Description
GMA provided both engineering and architectural design and coordination on this project. Project coordination across multiple agencies and design professionals was a large success. GMA provided engineering for the building foundations, second story concrete slab supporting a huge variety of equipment as well as pits, catwalks, retaining walls, and much more.
Merck – Elkton, VA
Medical Research and Development Facility
Merck – Elkton, VA
Project: Medical Research and Development Facility
Location
Elkton, VASquare Footage
Approx. 120,000Services
- E
Description
This massive metal building is over 70ft tall and consists of three stories. The building foundation design was especially challenging due to the large column reactions and poor soils conditions which required both straight and battered driven steel piles.
Deerpoint
Office and Warehouse Facility
Deerpoint
Project: Office and Warehouse Facility
Location
Madera, CASquare Footage
48,000Services
- A&E
Description
Attractive metal building with foundation design, tank containment areas, office layouts, and more.
Cummins
Fresno Service Center
Cummins
Project: Fresno Service Center
Location
Fresno, CASquare Footage
41,600Services
- A&E
Description
This metal building with a unique architectural flare serves as both an attractive office facility and service center.
Span Construction & Engineering, Inc.
Costco Fuel Facility
Span Construction & Engineering, Inc.
Project: Costco Fuel Facility
Location
Clovis, CASquare Footage
10,987Services
- E
Description
This steel framed fuel station canopy is one of many local projects for GMA. GMA provides structural engineering of the steel framed fuel station canopy for this location and for locations throughout the U.S., Canada, and Mexico. Engineering of these facilities varies from hurricane zones, extreme cold and snow, and high seismic areas. Plus, GMA has provided foundation systems ranging from conventional shallow foundations to driven timber or steel piles, drilled CIP concrete piers, and many more.
Central Valley Trailer Repair (CVTR)
Service Center
Central Valley Trailer Repair (CVTR)
Project: Service Center
Location
Fresno, CASquare Footage
53,000Services
- A&E
Description
This project consists of a metal building with standard shallow foundations designed by GMA. Office layout design was also provided for this beautiful office/warehouse/service center building.
Beckenhauer Construction, Inc.
Immanuel High School Chapel and Performing Arts Building
Beckenhauer Construction, Inc.
Project: Immanuel High School Chapel and Performing Arts Building
Location
Reedley, CASquare Footage
15,000Services
- A&E
Description
A beautiful high-ceilinged single story chapel and theater combined with a three story classroom facility situated on the school campus. The structure was built with a combination of steel, wood and concrete construction.
Pitman Family Farms (Mary’s Chickens)
Processing Facility and Offices
Pitman Family Farms (Mary’s Chickens)
Project: Processing Facility and Offices
Location
Sanger, CASquare Footage
93,500Services
- A&E
Description
A three-story precast concrete and steel building used for meat processing, cold storage, offices and machinery. This project also used a grade beam and drilled pier foundation system due to the heavy construction and compressible soils on the site.
Dry Ranch, LLC
Madera Pistachio Processing Plant
Dry Ranch, LLC
Project: Madera Pistachio Processing Plant
Location
Firebaugh, CASquare Footage
111,200 sq. ft.Services
- A&E
Description
GMA provided structural engineering and architectural services for this all new state of the art pistachio processing facility. Engineering of the metal building foundations for multiple buildings was only the beginning. Coordination and engineering for all of the equipment anchorage and foundations as well as pits and mat foundations for silos made this project one that pulled all of GMA’s talent together.
HMC Farms
Cold Storage & Packing Facility
HMC Farms
Project: Cold Storage & Packing Facility
Location
Kingsburg, CASquare Footage
Approx. 200,000Services
- A&E
Description
GMA has provided engineering and architectural coordination for the development and construction of this state of the art fruit packing and cold storage facility.
Hallaian Homes and Properties
N. Wilson Office Building
Hallaian Homes and Properties
Project: N. Wilson Office Building
Location
Fresno, CASquare Footage
8920 sq. ft.Services
- A&E
Description
Single story wood framed office building that utilizes open-web trusses. The foundation was designed as a combination of grade beams and pad footings to minimize future differential settlement issues due to the fact that this building is partially located on a landfill.